Sleeve Expansion Joint

 1. Sleeve type compensator in the installation shall be properly kept, prevent weathered and dust pollution.

2. When installation, should check the compensator model specification and design are consistent, the product surface should be no bruising, pit, and the serious corrosion defect affecting the quality of products, etc.

3. The onetime compensator is consistent with the samples, the total length of finished products don't have to stretch or compression, if there is new on the telescopic duct installation line, should again after alignment for installation

4. For twoway thrust compensator, a diagram must be in the note to the flow direction of medium of the installation, when the medium is steam, lest compensator to form gas plug. In order to guarantee the compensation amount of the compensator two directions are equal, when the design must have the two-way compensator is arranged between two fixed point.

5. The phase compensator on both ends of the welding section must break processing, water pressure test in accordance with requirements after welding(pressure test on both ends of the bolt should be tighten packing chamber) without any leakage. Run 24 hours later, the packing room must be tight on both ends of the bolt again.

6. In order to guarantee pipeline without lateral displacement, only along the axial expansion, the expansion pipe side guide bracket. When two side of compensator are axial displacement, then both sides should guide bracket, ensure that the axial displacement of compensator eccentricity plus or minus (+ -) not more than once.

7. The compensator can be the same as the pipe insulation waterproof structure, but can not exert blind on the expansion period.

 

 

Email Address: sales@huanzhonggd.com 

Sleeve Expansion Joint

Pre: Difference between Flexible and Rigid Water-proof Sleeve
Next: Method to Distinguish Gas Film and Hard Film Rubber Joint