How to store the square expander

How to store the square expander
If the square expander cannot meet the condition of doing static balancing of disc rotor, it needs to do two planes to balance, i.e. dynamic balancing. Usually the square expander does not need to do the dynamic balance test again after changing the rubber ring, but it should ensure that the impeller parts replaced have done the dynamic balance test.
 
If the user cuts the diameter of the square expander after the dynamic balance test, it is necessary to do the dynamic balance test again. For the square expander, the impeller is replaced, even if the impeller has done the dynamic balance test, when the square expander is replaced, the square expander is installed on the pipe, the square expander also needs to do the dynamic balance test again, and remember the location of each part, and then remove and re-install the pump according to the location where the impeller is located in the dynamic balance test.
 
①Pairing flange specifications and models are the same; when connecting with equipment flange should be paired according to its specifications;
 
② coaxial and parallel when flange is connected, and the flange surface is perpendicular to the center of the pipe;
 
③Fastening bolt specifications are the same, the direction is the same, the bolt exposed length is 1/2 bolt diameter or flush with the nut;
 
④When connecting the square expander, the nut is placed on the valve side; the two screw holes above the horizontal pipe flange are kept horizontal, and the two screw holes of the vertical pipe flange against the wall are parallel to the wall.
 
After tightening the square telescope to reveal 2-3 teeth screw tail, clear excess filler, exposed silk teeth painted with red Dan to prevent rust. The width of the red paint is consistent, the coating is uniform, and there is no flow or leakage.
 