Note of Flow Direction of Medium When Installing Double Flange Power Delivery Joint

Double flange power delivery joint is the key parts of connecting the pump and pipeline, which can transfer axial thrust in the pipeline; make pump valve and the pipeline connection as a whole. When installing, pay attention that water flow through the internal tube, and then flows through the pipe joint and last through the pipe.
Double flange power delivery joint plays a role of connection in the whole pipeline system. Pipeline system is used to transport material, mainly applicable to the following material, gas, air, oil, fuel oil, lubricating oil, fresh water, sewage, conveying water, hot and cold water, drinking water, temperature of which is not higher than 250 degrees.  Because of these material mainly transmitted through pipeline, in the process of pipeline transmission, these substances will certainly go through power delivery joint or the joint, then the joint directly relates to whether the whole pipeline system is in a good transmission process, which is very important and intuitive, the nuances lies in the connection, a transmission, a power delivery, this is the purpose of the expansion joint.

dismantling joint.jpg

Pre: Note of Flow Direction of Medium When Installing Double Flange Power Delivery Joint
Next: How to Set up the Stents When Installing Double-flange Limited Expansion Joint