What Should You Do When Water Sleeve Blocked
In application process we will usually see flexible water sleeve is embedded in the process of blocking situations. HuanZhong flexible water sleeve as a professional pipefitings equipment, to be embedded in the actual application installation, after installation completing there is an important job for block off between wall and water sleeve.
First is to cast the slab, column beam bushings in conjunction with construction when the installation is complete, using newspapers, trash and other soft material to fill up before pouring concreteto the wall. Remember that don't fill missing gap. it is intended to prevent mortar into the casing and terminal box cause jams.
The second is to prevent external groundwater or rainwater through flexible waterproof casing into basement, ensure there is a good working situation. And we use flexible things on the flexible water sleeve. and when flexible waterproof operations, one end use welded steel seal and then open when the water sleeve installed.
Third, there is reservation at the wall, floor or roof. And then casting buried when the construction finished, both end of the wall sleeve must be sealed well.
Fourth, Go through civil air defend floor, wall pipeline and piezometric tube. and then airtight waterproof casing with structure.